Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Bridges
Remove constraint Subject: Bridges
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Piling (Civil engineering)
Remove constraint Subject: Piling (Civil engineering)
1 - 4 of 4
Search Results
-
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
Citation -
P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4544NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows east side footing with 4 regular piles in front with 2 added piling in rear. One can just see the added pile behind ...
Citation