Search
You searched for:
Start Over
Dams
Remove constraint Dams
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Author
Wamstad, C. O.
Remove constraint Author: Wamstad, C. O.
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 1 - 10 of 20 | Next »
Search Results
-
1. [Image] Gerber Dam
KP-2148-R2 - Klamath Project. Gerber Dam. Downstream face of dam as seen from right abutment, showing seepage from closure joint at far side of spillway; August 21, 1952; Photo by C. O. WamstadCitation -
2. [Image] Link River Dam
KP-2189-R2 - Link River Dam. Klamath Project. General view of downstream face of Dam and River Outlet Stilling Basin; November 26, 1952; Bureau of Reclamation Photo by C. O. WamstadCitation -
3. [Image] Gerber Dam
KP-2242-R2 - Klamath Project--Gerber Dam. General downstream view showing old existing outlet channel along the face of dam; May 26, 1954; Photo by C. O. WamstadCitation -
4. [Image] Gerber Dam - Outlet Channel
KP-2243-R2 - Klamath Project--Gerber Dam. Outlet Channel where it had washed back against the face of the dam below the spillway; May 26, 1954; Photo by C. O. WamstadCitation -
KP-2247-R2 - Klamath Project--Gerber Dam. General view of gate house, pool and new channel constructed below dam; November 12, 1954; Photo by C. O. Wamstad
Citation -
KP-2248-R2 - Klamath Project--Gerber Dam. General view of gate house, looking into pool below valve house from top of dam; November 12, 1954; Photo by C. O. Wamstad
Citation -
7. [Image] Gerber Dam - Deepest part of pool
KP-2254-R2 - Klamath Project--Gerber Dam. Deepest part of pool below center part of spillway - about 4' deep. Shows no erosion of concrete on face of dam; November 12, 1954; Photo by C. O. WamstadCitation -
8. [Image] Link River Dam
KP-2119 & 2120-R2. Link River Dam. General view of river section just downstream from dam. 3,888 cfs being released. Gate openings from right end of dam. River gate No. 1 - 7 ft.; No. 2 - 4 ft.; stoplog ...Citation -
9. [Image] Gerber Dam
KP-2104-R2 - Klamath Project. Gerber Dam. Coating of construction joints upstream face with Neoprene material. Center portion of spillway section; October 1951; Photo by C. O. WamstadCitation -
10. [Image] Gerber Dam
KP-2105-R2 - Klamath Project. Gerber Dam. Coating of construction joints upstream face with Neoprene material. Closure slot left side of spillway; October 1951; Photo by C. O. WamstadCitation