Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Tolley, H.F.
Remove constraint Author: Tolley, H.F.
« Previous | 11 - 20 of 33 | Next »
Search Results
-
11. [Image] "J" Canal - 4" reinforced concrete lining placed in 1939 between Stations 1125 and 1152-91.8
KP-1738-R2 - Klamath Project. Concrete in excellent condition, with no apparent cracking. Situated in porous sand. Joints plain, not edged, opened 1/16 inch.October 19, 1948; Photo by H. F. TolleyCitation -
12. [Image] "J" Canal lined section at Sta. 152-91.8
KP-1739-R2 - Klamath Project. Picture shows transition from normal canal section to lined section; October 19, 1948; Photo by H. F. TolleyCitation -
Roll 1 No. 6 - Klamath Project; October 18, 1948; Photo by H. F. Tolley
Citation -
14. [Image] "A" Canal 2-inch gunite lined section
Roll 1 No. 8 - Klamath Project. "A" Canal 2-inch gunite lined section, showing exposed wire mesh, vertical crack heaving and completely disintegrated lining. Gunite at bottom of the slope completely gone; ...Citation -
15. [Image] "A" Canal 2-inch gunite lining in vicinity of Sta. 462, showing bulging and disintegration
Roll 2 No. 1 - Klamath Project; October 19, 1948; Photo by H. F. TolleyCitation -
16. [Image] "A" Canal 2-inch gunite lining in vicinity of Sta. 462, showing bulging and disintegration
Roll 2 No. 2 - Klamath Project; October 19, 1948; Photo by H. F. TolleyCitation -
17. [Image] "A" Canal gunite lining left side of canal
Roll 2 No. 4 - Klamath Project. Note heaving and disintegration. Joint has been patched, but insufficient allowance for expansion has resulted in additional disintegration; October 19, 1948; Photo by ...Citation -
Roll 2 No. 7 - Klamath Project. Four-inch concrete lining placed in 1940. Sections 10 feet, with plain joints slightly opened. Concrete in excellent condition; October 19, 1948; Photo by H. F. Tolley...
Citation -
19. [Image] "F" Canal Sta. 0-00 to 10-00, 4-inch reinforced concrete lining placed in 1940 by C.C.C. enrolees (sic)
Roll 3 No. 1 - Klamath Project. Concrete in excellent condition. No apparent cracking; joints plain, not edged; October 19, 1948; Photo by H. F. TolleyCitation -
20. [Image] "J" Canal concrete lining, showing plain joint spalling where it has not been marked with an edger
Roll 3 No. 4 - Klamath Project; October 19, 1948; Photo by H. F. TolleyCitation