Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
« Previous | 551 - 558 of 558 | Next »
Search Results
-
P-12-200-4154NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4155NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4156NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
554. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4206NA Klamath Project - Oregon-California. (Caption same as P-12-200-4205, except looking northeast).Citation -
555. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C 910 - Patterson Constr. Co., Contractor
CN-12-201-497NA Klamath Project - Oregon-California; View of John Deere scraper making the 0.5 ft. fill over the open drains to be filled; November 1974; USBR photo by D. W. SteinCitation -
CN-12-201-520NA Klamath Project. View showing control panel at the booster pump station; May 15, 1975; USBR photo by D. W. Stein
Citation -
CN-12-200-36A Gerber Watershed - Klamath Project, Oregon-California. Looking northeast at Wildhorse Diversion Dam from downstream side of dam. Rocks, limbs, etc., have been piled on top of dam to impede ...
Citation -
558. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C 910 - Patterson Constr. Co., Contractor
CN 12-201-496NA Klamath Project - Oregon-California. Another view of the John Deere scraper making the 0.5 fill over the open drains to be filled.Citation