Search
You searched for:
Start Over
History
Remove constraint History
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 254 | Next »
Search Results
-
1. [Image] View of pipe laying operation
CN-12-201-196NA Klamath Project - Oregon-California; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
2. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation -
P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
Citation -
4. [Image] TULE LAKE SUMP 3 - Spec. No. 200C-519
P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. SteinCitation -
P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
Citation -
P12-200-2796A Tule Lake Sumps - Klamath Project--Oregon-California. View of opening cut in R-Canal bank about 100 feet downstream from headgate to permit controlled release of flood water from Sump ...
Citation -
P12-200-2800A Tule Lake Dike Repair - Klamath Project--Oregon-California. Fill about 2 1/2 feet. Lake W.S. El. 4035.20. Flooded lands in Sump 2 at right. Sierra Pacific Const. Co., Contractor - Specs. ...
Citation -
P12-200-2801A Tule Lake Dike Repair - Klamath Project--Oregon-California. Truck, 10 c.y. (owned and operated by Ray Hon) dumping load. Sierra Pacific Const. Co., Contractor - Specs. No. DC-6246; March ...
Citation -
P12-200-2802A Tule Lake Sump 2 - Klamath Project--Oregon-California. View from pumping Plant No. 9 looking south. Water El. 4029.17; maximum was 4029.52; March 5, 1965; Bureau of Reclamation photo by ...
Citation -
10. [Image] Tule Lake Sump 2 - Flooded lease lands
P12-200-2804A Tule Lake Sump 2 - Klamath Project--Oregon-California. View northeast from point 1/2 mile south of Q-Canal headworks showing flooded lease lands. Water on lands at El. 4029.17; March 5, ...Citation