Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Subject
Trenches
Remove constraint Subject: Trenches
« Previous | 1 - 10 of 82 | Next »
Search Results
-
P-12-200-3082NA Klamath Project - Oregon-California. View looking east on closed drain #19-1, with trencher and 10 cubic yard end dump truck in background. Note water in trench. Outlet pipe was running ...
Citation -
P-12-200-3094NA Klamath Project - Oregon-California. View of outlet area, looking downstream Line #53-1. Note heavy flow of water. Solid pipe and cut-off collar to the right of photo is to be installed; ...
Citation -
P-12-200-3095NA Klamath Project - Oregon-California. View of outlet area, looking downstream Line #53-1. Note heavy flow of water. Solid pipe and cut-off collar at right of photo is to be installed; ...
Citation -
CN-12-201-203NA Klamath Project - Oregon-California. View of cutoff trench. The workmen in photo are removing loose material from the cutoff trench; November 1972; Bureau of Reclamation photo by D. W. ...
Citation -
P12-200-2907NA Klamath Project - Oregon-California. View of pipe laying operation. Note relationship of trenching machine to dump truck; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2908NA Klamath Project - Oregon-California. View of Hoes Gigant trencher operating in cold weather; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2911NA Klamath Project - Oregon-California. It bacame [sic] necessary to scrape the snow away from the front of the trenching machine because of its high flotation. The maching was unable to ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. SteinCitation