Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 21 - 30 of 46 | Next »
Search Results
-
21. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 2000-842, Patterson Constr. Co., Contractor
CN-12-201-223NA Klamath Project - Oregon-California. View showing trailer that was used to string pipe ahead of trenching operations. As the truck drove forward, the pipe simply un-reeled itself; November ...Citation -
22. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No, 200C-842, Patterson Constr. Co., Contractor
CN-12-201-239NA Klamath Project - Oregon-California. The contractor moved several CMP culverts, which were apparently used by the lessees and stored in the drain, in order to fill the drain. Most drains ...Citation -
23. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No, 200C-842, Patterson Constr. Co., Contractor
CN-12-201-240NA Klamath Project - Oregon-California. In filling drains along the north-south road, it was necessary to rip up the surface of the road for material to fill the adjacent open drain. This ...Citation -
24. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-249NA Klamath Project - Oregon-California. Close-up view of Laser Beam command post showing adjustment screws. The head is leveled in the same manner that a theodolite is leveled. The crank ...Citation -
25. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-251NA Klamath Project - Oregon-California. View of Laser Beam command post controls. Note the two bubbles used for leveling the apparatus. The dial is to set the beam on the desired slope; December ...Citation -
26. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-264NA Klamath Project - Oregon-California. View of DW-20 scraper hauling road base material from the USBR pit at the south end of Sump 1-A. Owing to their large capacity (25 c.y.) and resultant ...Citation -
27. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...Citation -
CN-12-201-350NA Klamath Project - Oregon-California. View of driller using #CP-55 drill to drill for grouting crest area of spillway; December 1973; Bureau of Reclamation photo by D. W. Stein
Citation -
CN-12-201-353NA Klamath Project - Oregon-California. Grouting spillway area. Hookup shows a 7 foot packer being used; December 1973; Bureau of Reclamation photo by D. W. Stein
Citation -
30. [Image] Clear lake Spillway Rehabilitation - Specs. No. 200C-889 - Roy D. Garren Corporation, Contractor
CN-12-201-358NA Klamath Project - Oregon-California. View of spillway, looking west. 4-Ton wrecking ball being used to break off concrete which has previously been drilled on 8-inch centers. View also ...Citation