P-12-200-4157NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised coulters for this view. Photo shows 4-inch pipe with drain guard about 5' below natural ground; ...
Citation -
P-12-200-4158NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised the coulters for this view. Photo shows 8-inch pipe about 6.5 ft. below natural ground surface. ...
Citation -
P-12-200-4188NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
Citation -
P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
Citation -
5. [Image] KLAMATH STRAITS DRAIN
P12-200-2741A- Klamath Project - KLAMATH STRAITS DRAIN - View of Fish and Wildlife Service dragline cleaning left side and bottom section, Sta. 489, working upstream. Note right side previously cleaned ...Citation -
P12-200-2742A Tule Lake Division - Klamath Project -- Oregon-California. Contractors equipment in foreground consists of a 22-B Bucyrus Erie dragline and a TD-6 dozer. George R. Stacy Contractor, Specifications ...
Citation -
P12-200-2743A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; George R. Stacy Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation ...
Citation -
P12-200-2744A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; leveling of berm is in progress. George R. Stacy, Contractor Specifications No. 200C-541; ...
Citation -
9. [Image] Tule Lake Division - View showing installation of 24" Flume extension at Sta. 47+ on the N-1 Lateral
P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...Citation -
10. [Image] Tule Lake Division - View showing the installation of Flume section which spans the 101-C-1 Drain at Sta. 47
P12-200-2746A Tule Lake Division - Klamath Project -- Oregon-California. George R. Stacy, Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation photo by D. W. SteinCitation