Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Subject
Irrigation canals and flumes -- Maintenance and repair
Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Trucks
Remove constraint Subject: Trucks
1 - 3 of 3
Search Results
-
P-12-200-4196NA Klamath Project - Oregon-California. Ten cu. Yd. end dump truck dumping riprap downstream right side of Township Line Bridge. This is to be placed and shaped later with 3/4 yd. linkbelt ...
Citation -
2. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4222NA Klamath Project - Oregon-California. Borrow pit for sub-base material for road to be constructed on west bank of drain. Material was very tight and had to be ripped by a D-8 dozer. ...Citation -
3. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4223NA Klamath Project - Oregon-California. Borrow pit for finish grade material for road to be constricted on west bank of drain. D-8 dozer ripping material and 4 c.y. caterpillar loading 20 ...Citation