Search Results
-
P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
Citation -
P12-200-2838NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. Invitation No. 200-B-3106, Contractor - Francis D. Brown & Son, Inc. View of 102-C-1 ...
Citation -
P12-200-2839NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. 102-C-1 Drain looking south, taken from intersection of 102-D Drain. 22-B dragline with ...
Citation -
P12-200-2840NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc., Invitation No. 200-B-3106. ...
Citation -
P12-200-2841NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc. 22-B dragline excavating ...
Citation -
P12-200-2842NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Excavating silt and straw from the 102-Drain adjacent to unit No. ...
Citation -
P12-200-2912NA Klamath Project - Oregon-California. View of trenching machine and hopper unit being moved from a completed drain line to another field; December 1972; Bureau of Reclamation photo by ...
Citation -
P12-200-2913NA Klamath Project - Oregon-California. Close-up view of digging chain prior to starting a new drain line. The hopper unit and trencher were backed up to an open collector drain, lowered ...
Citation -
P12-200-2914NA Klamath Project - Oregon-California. View of trencher unit beginning a new drain line. Note plastic pipe in hopper unit. It was left there to keep chute from filling up with dirt and cinders ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. SteinCitation