Search

Search Results

  • 4284
    P-12-200-4202NA NA Klamath Project - Oregon-California. Northwest 80-D dragline, with 60 ft. boot and 1-3/4 cu. yd. bucket, excavating drain at Sta. 200±, right side. View taken from Township Line ...
    Citation
  • 5084
    CN-12-201-545NA Klamath Project – Oregon. View of Klamath Straits Drain, left bank area, and small toe drain, looking downstream just below Pumping Plant E. Small toe drain to be relocated under Specs. ...
    Citation
  • 5085
    CN-12-201-546NA Klamath Project – Oregon. Klamath Straits Drain, looking west (downstream) from Sta, 301. This is the oxbow area, where new channel will be excavated under Specs. 200C-922; June 1975; USBR ...
    Citation
  • 5087
    CN-12-201-548NA Klamath Project – Oregon. View of Klamath Straits Drain, looking downstream at Sta. 307, left bank area; June 1975; USBR photo by D. W. Stein
    Citation
  • 5088
    CN-12-201-549NA Klamath. Project – Oregon. Klamath Straits Drain, looking downstream, from Pumping Plant E, left bank area. Note small drain ditch at left of bank. This is to be relocated under Specs. ...
    Citation
  • 5089
    CN-12-201-550NA Klamath Project – Oregon.Klamath Straits Drain. View of oxbow area Sta. 331, looking downstream. New channel to be constructed in this area under Specs. 200C-922; June 1975; USBR photo ...
    Citation
  • 5090
    CN-12-201-547NA Klamath Project - Oregon. Klamath Straits Drain - left bank area. Station 346, looking downstream; June 1975; USBR photo by D. W. Stein
    Citation
  • 5101
    CN-12-201-561NA Klamath Project – Oregon. View of Straits Drain, looking downstream, Sta. 360±. Left bank to be excavated in this area, under Specs. 200C-922; July 1975; USBR Photo by D. W. Stein
    Citation
  • 5104
    CN-12-201-562NA Klamath Project – Oregon. View of Straits Drain, looking upstream, Sta. 360±. Left bank to be excavated (right, in this photo) in this area, under Specs. 200C-922; July 1975; USBR photo ...
    Citation
  • 4235
    P-12-200-4153NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
    Citation