Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Stein, D.W. Remove constraint Author: Stein, D.W. Subject Drainage Remove constraint Subject: Drainage Subject Irrigation canals and flumes -- Maintenance and repair Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 4239
    P-12-200-4157NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised coulters for this view. Photo shows 4-inch pipe with drain guard about 5' below natural ground; ...
    Citation
  • 4240
    P-12-200-4158NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised the coulters for this view. Photo shows 8-inch pipe about 6.5 ft. below natural ground surface. ...
    Citation
  • 4241
    P-12-200-4159NA Klamath Project - Oregon-California. View of marmots at headworks of drain on left bank. Note large holes that extend very deep below ground surface; May 1976; USBR photo by D. W. S...
    Citation
  • 4242
    P-12-200-4160NA Klamath Project - Oregon-California. View of walkway installation at 36" CMP input, Sta. 51+90, left. Laborer using an earth wacker to drive sheet piling. Method seems to work but driver ...
    Citation
  • 4243
    P-12-200-4161NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
    Citation
  • 4244
    P-12-200-4162NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
    Citation
  • 4245
    P-12-200-4163NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
    Citation
  • 4246
    P-12-200-4164NA Klamath Project - Oregon-California. View of 36" walkway at Sta. 51+90, front piling looking down inside; May 1976; USBR photo by D. W. Stein
    Citation
  • 4247
    P-12-200-4165NA Klamath Project - Oregon-California. Walkway piling installed at Sta. 51+90, looking towards inlet gate; May 1976; USBR photo by D. W. Stein
    Citation
  • 4264
    P-12-200-4182NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
    Citation