Search

Search Results

  • 3450
    P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...
    Citation
  • 3451
    P12-200-2746A Tule Lake Division - Klamath Project -- Oregon-California. George R. Stacy, Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3825
    P12-200-2820A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Replaceing (sic) broken ...
    Citation
  • 3832
    P12-200-2823A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Contractor's workmen ...
    Citation
  • 4277
    P-12-200-4195NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 92+10, right. Sheet piling all completed and laborer with earth wacker compacting fill inside structure; June 1976; ...
    Citation
  • 3836
    P12-200-2827NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co.. Contractor's employee compacting backfill of wash ...
    Citation
  • 7. [Image] Lost River Repair
    3842
    P12-200-2832A Lost River Repair - Klamath Project - Oregon - California. Contractor's men shaping riprap on left abutment of bridge at Sta. 116+50 on Lost River, Specs. 200C-591. Contractor - Patterson ...
    Citation
  • 3915
    P12-200-2904NA Klamath Project - Oregon-California. Overall view of pipe laying operation. Dump truck is almost empty. Fields are covered with snow; December 1972; Bureau of Reclamation photo by D. ...
    Citation
  • 3916
    P12-200-2905NA Klamath Project - Oregon-California. View of pipe laying operation; December 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3920
    P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
    Citation