Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Subject
Construction workers
Remove constraint Subject: Construction workers
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 21 - 30 of 52 | Next »
Search Results
-
21. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4213NA Klamath Project - Oregon-California. Twenty cu. yd. belly dump spreading load of sub-base material on road area. Laborer spotting dump. View looking north; July 1976; USBR photo by ...Citation -
CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...
Citation -
23. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No 200C-842, Patterson Constr. Co., Contractor
CN-12-201-202NA Klamath Project - Oregon-California. View of cutoff trench. The trenching machine dug the cutoff wall, but in doing so left a large amount of dirt in the excavated area. It was necessary ...Citation -
24. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-203NA Klamath Project - Oregon-California. View of cutoff trench. The workmen in photo are removing loose material from the cutoff trench; November 1972; Bureau of Reclamation photo by D. W. ...Citation -
25. [Image] Closed Drain Construction - Tule Late Sump 3 – Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-207NA Klamath Project - Oregon-California. View of workman in trench; February 1973; Bureau of Reclamation photo by D. W. SteinCitation -
26. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-204NA Klamath Project - Oregon-California. View of outlet end of closed drain line before it was backfilled. Workmen are attaching plastic drainage tubing to the steel outlet pipe; November 1972; ...Citation -
27. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-209NA Klamath Project - Oregon-California. The outlet ends of the closed drains were filled and compacted by hand. Note marker post being positioned by workman; November 1972; Bureau of Reclamation ...Citation -
28. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-227NA Klamath Project - Oregon-California. Workman is coupling two sections of 4-inch tubing together, A 4-inch collar is taped around the tubing, making a very strong connection; November 1972; ...Citation -
29. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...Citation -
P-12-200-2955NA Klamath Project - Oregon-California. View showing concrete being placed in the crest area of the spillway between Sta. 0+70 and Sta. 1+00. This is the first placement of concrete made ...
Citation