Search

Search Results

  • 3869
    P12-200-2859A Klamath Project, Region 2 - Oregon-California. Hole is located on center line of tailrace area at Sta. 5+14. (Note good rock at start of hole); September 24, 1965; Bureau of Reclamation ...
    Citation
  • 3871
    P12-200-2861A Klamath Project, Region 2 - Oregon-California. Drill set up on the downstream hole, Sta. 6+24+; September 24, 1965; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3872
    P12-200-2862A Klamath Project, Region 2 - Oregon-California; September 24, 1965; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4008
    P-12-200-2996NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. This was an owner-operated truck; May 1974; Bureau ...
    Citation
  • 4009
    P-12-200-2997NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. (This was an owner-operated truck); May 1974; Bureau ...
    Citation
  • 4010
    P-12-200-2998NA Klamath Project - Oregon-California. View of bobtailed truck and trailer unloading sand and aggregate for concrete at Clear Lake Dam. (Owner operator's); May 1974; Bureau of Reclamation ...
    Citation
  • 4066
    P-12-200-3053NA Klamath Project - Oregon-California. View of borrow area near dam after material had been borrowed. The area has been dressed up by contractor. (Borrow can be noted at center and at right ...
    Citation
  • 3454
    P12-200-2749A Tule Lake Division - Klamath Project -- Oregon-California. Clear Lake Dam can be seen in the background; May 13, 1964; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3961
    P12-200-2949NA Klamath Project - Oregon-California. Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor Service Steel Erection. View of spillway slab crest area, ...
    Citation
  • 3962
    P-12-200-2950NA Klamath Project - Oregon-California. Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor Don D. Thompson, Sub-contractor. Spillway crest atea, ...
    Citation