Search

You searched for: Start Over History Remove constraint History Author Stein, D.W. Remove constraint Author: Stein, D.W. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 4266
    P-12-200-4184NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
    Citation
  • 4267
    P-12-200-4185NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
    Citation
  • 4268
    P-12-200-4186NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
    Citation
  • 4273
    P-12-200-4191NA Klamath Project - Oregon-California. View of walkway at Sta. 166+90, right. This is the walkway that was modified by contractor (cost reduction incentive); June 1976; USBR photo by ...
    Citation
  • 4274
    P-12-200-4192NA Klamath Project - Oregon-California. View of walkway at Sta. 166+90, right. This is the walkway that was modified by contractor (cost reduction incentive); June 1976; USBR photo by ...
    Citation
  • 4275
    P-12-200-4193NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 69+20, left. Sheet piling is being installed; June 1976; USBR photo by D. W. Stein
    Citation
  • 4276
    P-12-200-4194NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 69+20, left. Sheet piling is being installed; June 1976; USBR photo by D. W. Stein
    Citation
  • 4277
    P-12-200-4195NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 92+10, right. Sheet piling all completed and laborer with earth wacker compacting fill inside structure; June 1976; ...
    Citation
  • 4278
    P-12-200-4196NA Klamath Project - Oregon-California. Ten cu. Yd. end dump truck dumping riprap downstream right side of Township Line Bridge. This is to be placed and shaped later with 3/4 yd. linkbelt ...
    Citation
  • 4279
    P-12-200-4197NA Klamath Project - Oregon-California. Linkbelt dragline placing and shaping riprap upstream, left of Township Line Bridge; June 1976; USBR photo by D. W. Stein
    Citation