Search Results
-
CN-12-201-291NA Klamath Project - Oregon-California. Experimental Line in Unit 71. View of fiberglass membrane covered tubing being fed into hopper unit behind trenching machine. Installation methods were ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
Citation -
P12-200-2929NA Klamath Project - Oregon-California. View of small crawler tractor being used to backfill the open trench. Excavated earth, windrowed along the open trench, provides the material needed ...
Citation -
P12-200-2936NA Klamath Project - Oregon-California. View of a workman using a whacker to obtain the required compaction at the outlet end of the drain line; December 1972; Bureau of Reclamation photo ...
Citation -
P-12-200-4072NA Klamath Project - Oregon-California. View of backfilling 10 foot cut-off trench at Sta. 50±, looking north. A small John Deere dozer was used to backfill. Note water in trench; September ...
Citation -
CN-12-201-180NA Klamath Project - Oregon-California. View showing string line and pointers used to maintain grade; October 11, 1972; Bureau of Reclamation photo by D. W.Stein
Citation -
CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...
Citation -
CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...
Citation