Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Construction equipment
Remove constraint Subject: Construction equipment
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 21 - 30 of 41 | Next »
Search Results
-
21. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-190NA Klamath Project - Oregon-California. View of trenching machine and dump truck loaded with cinders. Plastic drainage tubing is laid out in advance of the trenching operations; November ...Citation -
22. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-191NA Klamath Project - Oregon-California. View of cinders being discharged onto a conveyor belt which, in turn, discharges the cinders into the hopper unit behind the trencher. The conveyor ...Citation -
23. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-192NA Klamath Project - Oregon-California. View of pipe laying operation. The man in truck helps push cinders into the conveyor unit. The man on the hopper unit keeps cinders moving smoothly ...Citation -
24. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-8U2, Patterson Constr. Co., Contractor
CN-12-201-193NA Klamath Project - Oregon-California. View of trenching machine in action. Note the dirt being thrown out of trench by the digging chain. Note the plastic drainage tubing being threaded ...Citation -
25. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Construction Co., Contractor
CN-12-201-197NA Klamath Project - Oregon-California. Close-up view of cinders being fed into the hopper unit. Note how cinders are fed directly from the truck in a continuous operation; November 1972; ...Citation -
26. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-198NA Klamath Project - Oregon-California. Scene showing refueling of trencher; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
27. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No, 200C-842, Patterson Constr. Co., Contractor
CN-12-201-240NA Klamath Project - Oregon-California. In filling drains along the north-south road, it was necessary to rip up the surface of the road for material to fill the adjacent open drain. This ...Citation -
28. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Constr. Company, Contractor
P-12-200-3066NA Klamath Project - Oregon-California. View showing compacting earth material with a wacker compactor at outlet end of drain #18-1. Note water coming out of end of pipe; January 1975; ...Citation -
29. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Constr. Company, Contractor
P-12-200-3069NA Klamath Project - Oregon-California. View of operator and trencher control panel. Left side of panel shows lights for the Laser; January 1975; USBR photo by D. W. SteinCitation -
30. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Constr. Company, Contractor
P-12-200-3070NA Klamath Project - Oregon-California. View of 4" line and cinders being installed in closed drain #18-2; January 1975; USBR photo by D. W. SteinCitation