Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Sexton, H.W.
Remove constraint Author: Sexton, H.W.
Subject
Construction equipment
Remove constraint Subject: Construction equipment
1 - 7 of 7
Search Results
-
KP-1504-Klamath Project; Time 1:20 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1505-R2 - Klamath Project; First pass with a 4" X 6" strike-off, pulled by winch; Time 1:25 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the ...
Citation -
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
Citation -
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1510-R2 - Klamath Project. Note Fordson tractor with front end loader just dumping aggregate into batch plant hopper. Crane, batch plant, mixer, etc., located on north and west side of canal. Fordson ...
Citation