Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Renning, John A.
Remove constraint Author: Renning, John A.
Subject
Q-Canal (California)
Remove constraint Subject: Q-Canal (California)
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
« Previous | 1 - 10 of 11 | Next »
Search Results
-
KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
Citation -
KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
Citation -
KP-2564-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking downstream from Station 5+00. Bottom width 10 feet, height of canal banks, ...
Citation -
KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
Citation -
KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...
Citation -
KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
Citation -
KP-2568-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. Installing prefabricated metal wasteway at the end of the Q-1 Lateral, Station 88+33.7. Backfill compacted ...
Citation -
KP-2581-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Q-Canal headworks showing gate lifts installed and inlet channel completed; January 17, 1961; Photo by John A. ...
Citation -
KP-2582-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal filled with water, looking upstream from Station 34+00; January 17, 1961; Photo by ...
Citation -
KP-2583-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Looking upstream from Sta. 58+00 of Q-Canal. Bulkhead planks in check at Sta. 57+60 to hold water for ponding test; ...
Citation