Search

Search Results

  • 3859
    P12-200-2849NA Gerber Dam, Klamath Project, Oregon-California. View from top of dam looking down at access hole in ice, water surface elevation 1823.2. First divers returning after removing timber cover ...
    Citation
  • 3856
    P12-200-2846NA Gerber Dam, Klamath Project, Oregon-California. Team members from left to right: G. W. Fuller, civil engineer; J. L. Andrews, structural engineer; B. H. Carter, geologist; T. J. Spicher, ...
    Citation
  • 3855
    P12-200-2845NA - Gerber Dam, Klamath Project, Oregon-California. Reservoir surface covered with 14 inches of ice. Overflow spillway crest in background. From left to right: B. H. Carter, J. L. Andrews, ...
    Citation
  • 3857
    P12-200-2847NA Gerber Dam, Klamath Project, Oregon=California. First team of divers, with standby diver and line tenders, preparing for examination of trashrack area. Note "downline" in center of picture ...
    Citation
  • 3858
    P12-200-2848NA Gerber Dam, Klamath Project, Oregon-California. "Downline" in center. Hole in ice framed with 2' x 12' timbers. Left to right: Employee of Langell Valley Irrigation District; T. E. Morris; ...
    Citation
  • 3867
    P12-200-2857NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. Original timber covering the basin floor and concrete in overflow structure were in excellent condition. Two to three inches of ice ...
    Citation
  • 3868
    P12-200-2858NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. The five-man Regional Diving Team "warming up" after completion of stilling basin and downstream apron inspection. Left to right: T. ...
    Citation