Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Lawrence, C.D.
Remove constraint Author: Lawrence, C.D.
Subject
Gerber Dam (Oregon)
Remove constraint Subject: Gerber Dam (Oregon)
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 31 - 40 of 41 | Next »
Search Results
-
31. [Image] Gerber Dam Core Drilling Program
CN-12-200-44A Klamath Project, Oregon-California. View of core drilling platform. Drill is operating. Chet Gore, Chief Engineer's Office, is standing beside drill; October 1969; Bureau of Reclamation ...Citation -
32. [Image] Gerber Dam Core Drilling Program
CN-12-200-47A Klamath Project, Oregon-California. View of bucket of concrete being lowered from walkway on top of dam to drilling platform. The concrete was used to fill the core holes after the cores ...Citation -
33. [Image] Gerber Dam Core Drilling Program
CN-12-200-48A Klamath Project, Oregon-California. Picture of Bud Fehlhaber, driller's helper, removing core sample from drill hole; October 1969; Bureau of Reclamation photo by C.D.LawrenceCitation -
34. [Image] Gerber Dam Core Drilling Program
CN-12-200-50A Klamath Project, Oregon-California. View of blocking beneath the outer end of the drilling platform. Blocking was used in those places where the knee braces would not fit beneath the platform; ...Citation -
35. [Image] Gerber Dam Core Drilling Program
CN-12-200-52A Klamath Project, Oregon-California. View of core drill just before the drill was started. Note the drill barrel has not yet penetrated the dam; October 1969; Bureau of Reclamation photo ...Citation -
36. [Image] Gerber Dam Core Drilling Program
CN-12-200-53A Klamath Project, Oregon-California. View of core drilling platform being lowered into desired position above gate house. Platform was moving when the picture was taken; October 1969; Bureau ...Citation -
37. [Image] Gerber Dam Core Drilling Program
CN-12-200-55A Klamath Project, Oregon-California. View of core drilling platform from east walkway on top of dam. Note the core sample stored in box at rear of platform; October 1969; Bureau of Reclamation ...Citation -
38. [Image] Gerber Dam Core Drilling Program
CN-12-200-56A Klamath Project, Oregon-California. View of core drilling platform from east walkway at top of dam. Air compressor and hydraulic crane are shown, too; October 1969; Bureau of Reclamation ...Citation -
39. [Image] Gerber Dam Core Drilling Program
CN-12-200-57A Klamath Project, Oregon-California. View showing connection of knee brace to butt plate. (Bolts supporting butt plate were grouted into place); October 1969; Bureau of Reclamation photo ...Citation -
40. [Image] Gerber Dam Core Drilling Program
CN-12-200-60A Klamath Project, Oregon-California. The driller and his helper are adding an extension to drill bit. Pictured from left to right are: Angelo Doveri, owner-operator of hydraulic crane (at ...Citation