Search

You searched for: Start Over Photos Remove constraint Photos Author Kline, D.J. Remove constraint Author: Kline, D.J.

Search Results

  • 4602
    P12-201-4520 NA Klamath Project, OR-CA. Ady Siphon -- View of south wall of siphon inlet transition and portion of backfill over 84-inch RCP; February 28, 1978; USBR photo by D.J. Kline
    Citation
  • 4605
    P12-201-4523 NA Klamath Project, OR-CA. Plant FF No. 3 bay, between elev. A and B decks. Note effect of cleanup and also newly painted exterior surfaces of pump bowl and lower column; March 3, 1978; USBR ...
    Citation
  • 4608
    P12-201-4526 NA Klamath Project, OR-CA. View of trashracks at Plant FF. Note color range from dark to light. The lighter color is phenolic aluminum paint added to protect coal tar epoxy from sunlight; ...
    Citation
  • 4610
    P12-201-4528 NA Klamath Project, OR-CA. Cold weather protection that was installed for painting Plant FF pump units and also utilized for dressing up face of wall where spillage occurred when placing deck ...
    Citation
  • 4613
    P12-201-4531 NA Klamath Project, OR-CA. View shows open gates on Ady Canal after they had been closed to make 84" RCP crossing under Straits Drain; February 1978; USBR photo by D.J. Kline
    Citation
  • 4615
    P12-201-4533 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc completing the connection of Klamath Straits Drain to Plant FF's inlet; March 13, 1978; USBR photo by D.J. Kline
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation