    P12-201-4375 NA Klamath Project, OR-CA. Pumping Plant EE--Photo showing repair to torn gusset plate on boom of RHC's Manitowoc 3500 crane. It was repaired with ¼" steel plate by a certified welder; May ...
    Citation
  • 4458
    P12-201-4376 NA Klamath Project, OR-CA. Pumping Plant FF--Photo inside middle bay looking at placement below Elev. B for the 2 ft. thick wall. Note E-Con placer "elephant trunk" dispersing concrete; May ...
    Citation
  • 4476
    P12-201-4394 NA Klamath Project, OR-CA. Pumping Plant EE--View of inlet transition steel, showing finished product of original steel and added steel. Photo taken on east side of inlet just before tying ...
    Citation
  • 4536
    P12-201-4454 NA Klamath Project, OR-CA. Ady Canal--View looking west. Continuing to lay siphon from U.S. Hwy 97, toward S.P. RR tunnel. Here one can see the impending misalignment. Note: In foreground ...
    Citation
  • 4538
    P12-201-4456 NA Klamath Project, OR-CA. Ady Canal--Same as photo 4455NA, but view looking from RR east toward highway; September 1977; USBR photo by D.J. Kline
    Citation
  • 4544
    P12-201-4462 NA Klamath Project, OR-CA. PP EE PP&L work on new elevated transformer assembly. Note: The bow in center of aluminum frame holding up transformers; October 1977; USBR photo by D.J. Kline. ...
    Citation
  • 4713
    P12-201-4631NA Klamath Project, OR-CA. Same as Nos. 4629 and 4630 above. Work being done by T.I.D.; March 16, 1979; USBR photo by D.J. Kline
    Citation
  • 4559
    P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
    Citation
  • 4560
    P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...