  • 4555
    P12-201-4473 NA Klamath Project, OR-CA. Overall view of PP E and PP EE. Taken south of flume for center canal; November 23, 1977; USBR photo by D.J. Kline
    Citation
  • 4556
    P12-201-4474 NA Klamath Project, OR-CA. View of PP 'E' bridge looking from west to east. Piling far right driven to 40' depth. Remaining piling are in to a depth of 31'. Note: Center pile caught fire due ...
    Citation
  • 4557
    P12-201-4475 NA Klamath Project, OR-CA. Spoils removed from east side of PP 'E' outlet transition for PP 'E' bridge piling. Material was removed by backhoe due to rock; November 23, 1977; USBR photo by ...
    Citation
  • 4558
    P12-201-4476 NA Klamath Project, OR-CA. Case 580C Extend-a-Hoe excavating on east side of PP 'E' outlet transition for PP 'E' bridge piling. Note: Large rock in foreground removed from excavation; November ...
    Citation
  • 4626
    P12-201-4544NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows east side footing with 4 regular piles in front with 2 added piling in rear. One can just see the added pile behind ...
    Citation
  • 4471
    P12-201-4389 NA Klamath Project, OR-CA. Center Canal Flume--View showing original flume pier excavation. Notice area of light coloring behind perforated culvert. This is sand washed out from pile driving ...
    Citation
  • 4510
    P12-201-4429 NA Klamath Project, OR-CA. Ady Canal, U.S. Hway 97 and SPRR siphon--View looking east of west portal of tunnel under Hwy 97. Bobcat loader. Contractor's ventilation system and channel iron ...
    Citation
  • 4531
    P12-201-4449 NA Klamath Project, OR-CA. Concrete repairs at Plant FF 2nd left front wall. Had excessive amount of rock pockets due to apparent faulty air powered vibrators. Cold joint due to E-Con Placer ...