Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J.

Search Results

  • 4506
    P12-201-4425 NA Klamath Project, OR-CA. Ady Canal--Showing Hwy 97 tunnel west side of 94" tunnel liner plate enclosing 84" CMP carrier pipe; September 9, 1977; USBR photo by D.J. Kline
    Citation
  • 4507
    P12-201-4426 NA Klamath Project, OR-CA. Ady Canal--To get carrier pipe through the tunnel liner ice (crushed) was spread over sand bedding in tunnel liner plate. A car hood was used as a sled on leading ...
    Citation
  • 4508
    P12-201-4427 NA Klamath Project, OR-CA. Pumping Plant FF--Inoperable screw gates where Ady Canal runs under Klamath Straits Drain. Screw gates on siphon; August 29, 1977; USBR photo by D.J. Kline
    Citation
  • 4509
    P12-201-4428 NA Klamath Project, OR-CA. Ady Canal--due to damaged gates, contractor building a bulkhead for dewatering Ady Canal to excavate for siphon; August 29, 1977; USBR photo by D.J. Kline
    Citation
  • 4511
    P12-201-4430 NA Klamath Project, OR-CA. Ady Canal, Hwy 97, and SPRR Siphon-- Contractor forces repairing bedding for Hwy 97 which is sloughed out when shoring on the east side of the hwy shifted. This ...
    Citation
  • 4512
    P12-201-4421 NA Klamath Project, OR-CA. Reinforcement added at Pace Engineering request (designer of shoring for siphon) for Hwy 97 tunnel east portal. OSHA approved this design to prevent further sloughing ...
    Citation
  • 4513
    P12-201-4431 NA Klamath Project, OR-CA. Ady Canal--Initial shoring installed to prevent further failure of the east shoring at Hwy 97. This was installed on Aug. 17 prior to the tunnel shield fully exiting ...
    Citation
  • 4514
    P12-201-4432 NA Klamath Project, OR-CA. Ady Canal--the cribbing was cut with a chainsaw and tunnel shield pushed through the hole using hydraulics. View looking west as the shield exits through the shoring; ...
    Citation
  • 4515
    P12-201-4433 NA Klamath Project, OR-CA. Ady Canal--View looking east through completed tunnel liner; August 19, 1977; USBR photo by D.J. Kline
    Citation
  • 4516
    P12-201-4434 NA Klamath Project, OR-CA. Ady Canal--View looking east across Hwy 97 over tunnel site. Depression caused by shoring failure is visible on far side of road surface; August 19, 1977; USBR ...
    Citation