« Previous | 231 - 240 of 328 | Next »
Search Results
-
P12-201-4364 NA Klamath Project, OR-CA. Pumping Plant EE--E-Con placer with 50 ft. of 5" lining, placing concrete for walls at Plant EE. Placed an average of 40 cu. yds. per hour. Concrete was batched ...
Citation -
P12-201-4365 NA Klamath Project, OR-CA. Willamette Western getting 2900 Manitowoc into Plant FF excavation to drive timber piling; April 14, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4366 NA Klamath Project, OR-CA. Setting rebar in place for wall placement at Plant EE. Notice 1 wall of forms in place, and preparation underway for setting other wall where resteel in place; ...
Citation -
P12-201-4367 NA Klamath Project, OR-CA. Flume bridge stripped and cured. More backfill required; April 19, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4368 NA Klamath Project, OR-CA. Center Canal Flume--Flume damage looking west to east. Note bow in left wall between the two temporary top ties; May 16, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4369 NA Klamath Project, OR-CA. Center Canal Flume--Starting to couple together two 40 ft. sections of asphalt-dipped 24-inch CMP. This was installed as a temporary means of water conveyance ...
Citation -
P12-201-4370 NA Klamath Project, OR-CA. Center Canal Flume--Slide gate and coffer dam at inlet end of flume; May 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4371 NA Klamath Project, OR-CA. View of outlet of 24-inch CMP and dike; May 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4377 NA Klamath Project, OR-CA. Pumping Plant FF--View looking south of concrete placement for walls up to base of Elev. B slab; May 31, 1977; USBR photo by D. J. Kline
Citation