    P12-201-4311 NA Klamath Project, OR-CA. Center Canal - backflooding against 48" slide gate, causing gate to unseat and allowed flooding of flume inlet transition; January 17, 1977; USBR photo by D. J. ...
    Citation
  • 4393
    P12-201-4312 NA Klamath Project, OR-CA. Center Canal - existing flume outlet, where flooding exited after flowing down entire length of existing flume and flowing into flume pier excavation; January 17, ...
    Citation
  • 4394
    P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
    Citation
  • 4395
    P12-201-4314 NA Klamath Project, OR-CA. Center Canal - Contractor placed electric pump to remove flood water from flume inlet transition; January 17, 1977; USBR photo by D. J. Kline
    Citation
  • 4396
    P12-201-4315 NA Klamath Project, OR-CA. Dewatering well discharge PVC pipe broke at top of the well causing overnight flooding, with this result to Pumping Plant EE excavation; January 17, 1977; USBR photo ...
    Citation
  • 4398
    P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4399
    P12-201-4317 NA Klamath Project, OR-CA. Back view of construction bridge at Pumping Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4401
    P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4402
    P12-201-4320 NA Klamath Project, OR-CA. Row 12, Line 1, piling split at a depth of approximately 47 feet, Plant EE; January 20, 1977; USBR photo by D. J. Kline
    Citation