  • 4382
    P-12-201-4301 NA Klamath Project, OR-CA. Stripped and cured wing wall flume support for Center Canal outlet transition; December 1976; USBR photo by D. J. Kline
    Citation
  • 4383
    P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4385
    P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
    Citation
  • 4386
    P12-201-4305 NA Klamath Project, OR-CA. Dike built up another ±5' on inlet to Center Canal Flume; December 1976; USBR photo by D. J. Kline
    Citation
  • 4387
    P12-201-4306 NA Klamath Project, OR-CA. Nearly completed Plant EE excavation to depth elev. ±50. Water in excavation is due to the power being off to east side wells, for approximately 30 hours; December ...
    Citation
  • 4388
    P12-201-4307 NA Klamath Project, OR-CA. Trimming of side walls at Plant EE to better expedite a ± 1 to 1½/1 slope; December 1976; USBR photo by D. J. Kline
    Citation
  • 4389
    P12-201-4308 NA Klamath Project, OR-CA. Gravity hammer 2500 lbs. placing pile to depth of 2-3 feet for further driving to desired depth by air hammer. Soldier pile 1'x1'x16'; December 1976; USBR photo ...
    Citation
  • 4390
    P12-201-4309 NA Klamath Project, OR-CA. Break in earth dike holding farm land flood water. Dike located on west side of KSD. Approx. 8 man hours and 2 hrs. of Case 580 time was used; January 17, 1977; ...
    Citation
  • 4391
    P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January ...
    Citation