Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
« Previous | 141 - 150 of 328 | Next »
Search Results
-
141. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4603NA Klamath Project, OR-CA. S-16 Drain -- Pump used for dewatering S-16 is a rental QP Model 401 4" pump. This was used for one week only; April 20, 1979; USBR photo by D.J. KlineCitation -
142. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4604NA Klamath Project, OR-CA. S-16 Drain, existing outlet to KSD, Klamath Straits Unit West -- Volume of water being pumped by QP Model 401 pump is shown; April 20, 1979; USBR photo by D.J. ...Citation -
143. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4607NA Klamath Project, OR-CA. Klamath Straits Unit East -- View of 6" master water pump set up on KSD. This pump will be used to fill water truck for dust abatement and treating fill material; ...Citation -
144. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4609NA Klamath Project, OR-CA. 'A' Dike #12, Klamath Straits Unit East -- Test Excavation of north ditch Sta. 3+00 on 'A' dike #12 with 627 'B' scraper, scraper found surface even too wet, let ...Citation -
145. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4610NA Klamath Project, OR-CA. 'A' Dike #16, Klamath Straits Unit West -- Test excavation of 'A' Dike #10 with 627 B scrapers. With the sandy soil found here, the scrapers were able to excavate ...Citation -
146. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4611NA Klamath Project, OR-CA. Ray-Go 60 Ram compactor, Klamath Straits Drain -- Ray-Go has 9" deep foot penetration as shown; June 12, 1979; USBR photo by D.J. KlineCitation -
147. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4614NA Klamath Project, OR-CA. Ray-Go 60 Ram in action in C-1 lateral lining. Approx. Sta. 22+00; June 14, 1979; USBR photo by D.J. KlineCitation -
148. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4615NA Klamath Project, OR-CA. A-1-b Lateral, Klamath Straits Drain -- 40 cows belonging to Lou Hill escaped from fenced enclosure and did damage to survey staking on A-1-b Lateral; June 15, ...Citation -
149. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4621NA Klamath Project, OR-CA. C-1-b Lateral, Klamath Straits Drain -- Grad-all 600 fine grading C-1-b Lateral, approximately Sta. 89+00; June 19, 1979; USBR photo by D.J. KlineCitation -
150. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4626NA Klamath Project, OR-CA. S-17 Drain inlet, Klamath Straits Drain -- S-17a Drain inlet LT. Sta. 46+73; July 2, 1979; USBR photo by D.J. KlineCitation