  • 4714
    P12-201-4632NA Klamath Project, OR-CA. Photo of centering guides placed every 60' along length of 16" steel casing; April 10, 1979; USBR photo by D.J. Kline
    Citation
  • 4715
    P12-201-4633NA Klamath Project, OR-CA. Photo shows how gap was maintained between casing section welds to increase weld penetration; April 10, 1979; USBR photo by D.J. Kline
    Citation
  • 4716
    P12-201-4634NA Klamath Project, OR-CA. Photo shows the completed section of 16" casing with both centering guides and section weld; April 10, 1979; USBR photo by D.J. Kline
    Citation
  • 4717
    P12-201-4635NA Klamath Project, OR-CA. Overall view of drill rig with installation of 16" steel casing in progress; April 10, 1979; USBR photo by D.J. Kline
    Citation