Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Pumping Plant E (Oregon) Remove constraint Subject: Pumping Plant E (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction

Search Results

  • 4559
    P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
    Citation
  • 4560
    P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4562
    P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
    Citation
  • 4563
    P12-201-4481 NA Klamath Project, OR-CA. Picture shows area where PP 'E' bridge will be constructed over outlet transition. View taken from west side of KSD, looking east; November 15, 1977; USBR photo ...
    Citation
  • 4564
    P12-201-4482 NA Klamath Project, OR-CA. View of inlet transition interior. Note: Walls were partially formed. Contractor covering up to prevent further amounts of snow from getting into formed walls; ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation