You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Pumping Plant EE (Oregon) Remove constraint Subject: Pumping Plant EE (Oregon)

Search Results

  • 4663
    P12-201-4581NA Klamath Project, OR-CA. Pumping Plant EE. All 3 pumping units running normally; June 1978; USBR photo by D.J. Kline
    Citation
  • 4364
    P12-201-4283 NA Klamath Project Oregon-California. Pumping Plant EE excavation with one-half soldier piling driven to depth and the other half set in place only; December 14, 1976; USBR photo by D. J. ...
    Citation
  • 4375
    P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4381
    P-12-201-4300 NA Klamath Project, OR-CA. Completed dike between P Plant EE excavation and Kl. Str. Drain. View, looking east. of existing Plant E and excavation for Pumping Plant EE; December 1976; ...
    Citation
  • 4383
    P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4387
    P12-201-4306 NA Klamath Project, OR-CA. Nearly completed Plant EE excavation to depth elev. ±50. Water in excavation is due to the power being off to east side wells, for approximately 30 hours; December ...
    Citation
  • 4388
    P12-201-4307 NA Klamath Project, OR-CA. Trimming of side walls at Plant EE to better expedite a ± 1 to 1½/1 slope; December 1976; USBR photo by D. J. Kline
    Citation
  • 4396
    P12-201-4315 NA Klamath Project, OR-CA. Dewatering well discharge PVC pipe broke at top of the well causing overnight flooding, with this result to Pumping Plant EE excavation; January 17, 1977; USBR photo ...
    Citation