Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Pumping Plant EE (Oregon) Remove constraint Subject: Pumping Plant EE (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction Material Types Image Remove constraint Material Types: Image

Search Results

  • 4420
    P12-201-4338 NA Klamath Project, OR-CA. Outlet flap gates for Plants EE and FF; February 22, 1977; USBR photo by D. J. Kline
    Citation
  • 4423
    P12-201-4341 NA Klamath Project, OR-CA. Pumping Plant EE - View looking southeast at Manitowoc Dragline moving material excavated from around plant structural piles by Case 580 CK backhoe. The material ...
    Citation
  • 4424
    P12-201-4342 NA Klamath Project, OR-CA. Pumping Plant EE - View looking northwest of resteel for Plant EE's foundation slab being unloaded; March 15, 1977; USBR photo by D. J. Kline
    Citation
  • 4426
    P12-201-4344 NA Klamath Project, OR-CA. Pumping Plant EE - View looking northeast at pild (sic) driving trestle after removal of Bent #4. Note side and end rails, which have been reinforced to allow use ...
    Citation
  • 4427
    P12-201-4345 NA Klamath Project, OR-CA. Pumping Plant EE - View of Plant EE looking northeast. Bottom steel mat is in place and steel placers in process of tying top mat; March 18, 1977; USBR photo by ...
    Citation
  • 4428
    P12-201-4347 NA Klamath Project, OR-CA. Pumping Plant EE - E-Con concrete pump with 5" pump line sitting on pile driving trestle; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4429
    P12-201-4348 NA Klamath Project, OR-CA. Pumping Plant EE - View looking north along west wall area at concrete placement for the foundation slab of Plant EE. Concrete was hauled to jobsite in 8 c.y. loads ...
    Citation
  • 4432
    P12-201-4351 NA Klamath Project, OR-CA. E-Con placer elephant trunk placing concrete in plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4433
    P12-201-4352 NA Klamath Project, OR-CA. Both E-Con placers in operation here, placing middle section of Plant EE slab. Left section was previously completed; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4434
    P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation