« Previous | 311 - 320 of 325 | Next »
Search Results
-
P12-201-4549 NA Klamath Project, OR-CA. View looking east. Pumping Plant FF--north retaining wall. Section "A" placed previously. Section "B" where laborers working and Section "C" freshly placed concrete ...
Citation -
P12-201-4460 NA Klamath Project, OR-CA. View looking east. Pumping Plant EE--outlet transition material HD-5 Cat and laborer are standing on is imported 3/" minus with fines. This material is 1' deep. ...
Citation -
P12-201-4461 NA Klamath Project, OR-CA. PP EE--view looking south. Hanging flap gates on PP EE outlet structure, using Pettibone 30 Crane. Note: Curing compound had been sand blasted prior to flap gate ...
Citation -
P12-201-4462 NA Klamath Project, OR-CA. PP EE PP&L work on new elevated transformer assembly. Note: The bow in center of aluminum frame holding up transformers; October 1977; USBR photo by D.J. Kline. ...
Citation -
P12-201-4463 NA Klamath Project, OR-CA. Center Canal Flume--view looking east. Placement of rip rap on east bank of drain under flume; October 1977; USBR photo by D.J. Kline
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR ...
Citation -
P12-201-4473 NA Klamath Project, OR-CA. Overall view of PP E and PP EE. Taken south of flume for center canal; November 23, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4474 NA Klamath Project, OR-CA. View of PP 'E' bridge looking from west to east. Piling far right driven to 40' depth. Remaining piling are in to a depth of 31'. Note: Center pile caught fire due ...
Citation -
P12-201-4475 NA Klamath Project, OR-CA. Spoils removed from east side of PP 'E' outlet transition for PP 'E' bridge piling. Material was removed by backhoe due to rock; November 23, 1977; USBR photo by ...
Citation