Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Piling (Civil engineering)
Remove constraint Subject: Piling (Civil engineering)
« Previous | 1 - 10 of 24 | Next »
Search Results
-
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
Citation -
P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
Citation -
P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
Citation