You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction

Search Results

  • 4707
    P12-201-4625NA Klamath Project, OR-CA. 4' Sheet's Foot Roller, Klamath Straits Drain -- Photo shows approved 4' Sheet's Foot Roller attached to D-5 cat; June 29, 1979; USBR photo by D.J. Kline
    Citation
  • 4708
    P12-201-4626NA Klamath Project, OR-CA. S-17 Drain inlet, Klamath Straits Drain -- S-17a Drain inlet LT. Sta. 46+73; July 2, 1979; USBR photo by D.J. Kline
    Citation
  • 4454
    P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
    Citation
  • 4455
    P12-201-4373 NA Klamath Project, OR-CA. Center Canal Flume--Photo showing 24-inch CMP laid through straight portion of the flume. The joint between the old and new portions of the flume can be seen as ...
    Citation
  • 4456
    P12-201-4374 NA Klamath Project, OR-CA. Central Canal Flume--Photo looking west, showing 24-inch CMP making outlet curve of flume; May 23, 1977; USBR photo by D. J. Kline
    Citation
  • 4466
    P12-201-4384 NA Klamath Project, OR-CA. Center Canal Flume--North side of flume joint--Separation of old flume and newly constructed section of flume;separation at top was .21 of a foot at the worst point. ...
    Citation
  • 4467
    P12-201-4385 NA Klamath Project, OR-CA. Center Canal Flume--RHC Construction applied 3 of these metal retaining clamps and also 4x14" kick braces to both sides of flume wall; May 24, 1977; USBR photo ...
    Citation
  • 4472
    P12-201-4390 NA Klamath Project, OR-CA. View of four piling being driven on south side of flume prior to cutoff; June 16, 1977; USBR photo by D. J. Kline
    Citation
  • 4473
    P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
    Citation
  • 4483
    P12-201-4401 NA Klamath Project, OR-CA. Ady Canal Siphon--Shoring being installed; July 18, 1977; USBR photo by D.J. Kline
    Citation