Search

Search Results

  • 4567
    P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4575
    P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4635
    P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
    Citation
  • 4645
    P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4370
    P12-201-4289 NA Klamath Project OR-CA. Tying rebar in place for flume pier base (footing); January 13, 1977; USBR photo by D. J. Kline
    Citation
  • 4372
    P12-201-4291 NA Klamath Project OR-CA. Finishing of pier slab; pier extension rebar also shown. Center Canal Flume; January 14, 1977; USBR photo by D. J. Kline
    Citation
  • 4408
    P12-201-4326 NA Klamath Project, OR-CA. Center Canal Flume - Repairing flume of north outside wall. Workers are dry packing snap tie holes and putting on dry sacking finish cement; February 17, 1977; ...
    Citation
  • 4441
    P12-201-4359 NA Klamath Project, OR-CA. Applying final concrete lift on this section (SW corner) of Plant FF bottom slab; May 5, 1977; USBR photo by D. J. Kline
    Citation
  • 4451
    P12-201-4369 NA Klamath Project, OR-CA. Center Canal Flume--Starting to couple together two 40 ft. sections of asphalt-dipped 24-inch CMP. This was installed as a temporary means of water conveyance ...
    Citation