« Previous | 11 - 20 of 64 | Next »
Search Results
-
P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
Citation -
P12-201-4548NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from north looking south of flume bridge area. An apparent slip fault was noted where shovel is standing between flume north ...
Citation -
P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
Citation -
P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
Citation -
P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
Citation -
P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
Citation -
P12-201-4560NA Klamath Project, OR-CA. Center Canal Flume Bridge. Two holes precut into steel sleeve on one side only, prior to pile fitting; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4561NA Klamath Project, OR-CA. Center Canal Flume Bridge. Flume Bridge south abutment. Original driven pile trimmed and ready to receive steel splice sleeve; April 4, 1978; USBR photo by D.J. ...
Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation