Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Center Canal (Oregon) Remove constraint Subject: Center Canal (Oregon) Subject Irrigation canals and flumes -- Maintenance and repair Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Material Types Image Remove constraint Material Types: Image

Search Results

  • 4371
    P12-201-4290 NA Klamath Project OR-CA. 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete from transit mixer to pier (excavation site). Center Canal flume in background; January 14, 1977; ...
    Citation
  • 4372
    P12-201-4291 NA Klamath Project OR-CA. Finishing of pier slab; pier extension rebar also shown. Center Canal Flume; January 14, 1977; USBR photo by D. J. Kline
    Citation
  • 4373
    P12-201-4292 NA Klamath Project OR-CA. Curing protection for below freezing conditions. Bisqueen tent and in background, note 10 gal. propane tank with radiant heater placed inside tent. Pier footing ...
    Citation
  • 4382
    P-12-201-4301 NA Klamath Project, OR-CA. Stripped and cured wing wall flume support for Center Canal outlet transition; December 1976; USBR photo by D. J. Kline
    Citation
  • 4386
    P12-201-4305 NA Klamath Project, OR-CA. Dike built up another ±5' on inlet to Center Canal Flume; December 1976; USBR photo by D. J. Kline
    Citation
  • 4404
    P12-201-4322 NA Klamath Project, OR-CA. Center Canal - Case 580 Construction King used to break 18" frost layer for flume extension floor; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4405
    P12-201-4323 NA Klamath Project, OR-CA. Center Canal - Floor form for pier extension over flume pier excavation; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4406
    P12-201-4324 NA Klamath Project, OR-CA. View of flume outlet transition prior to placement of compacted backfill - Center Canal Flume; February 7, 1977; USBR photo by D. J. Kline
    Citation
  • 4407
    P12-201-4325 NA Klamath Project, OR-CA. Compacting backfill material with wacker on flume inlet transition - Center Canal Flume; February 11, 1977; USBR photo by D. J. Kline
    Citation
  • 4408
    P12-201-4326 NA Klamath Project, OR-CA. Center Canal Flume - Repairing flume of north outside wall. Workers are dry packing snap tie holes and putting on dry sacking finish cement; February 17, 1977; ...
    Citation