Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Center Canal (Oregon) Remove constraint Subject: Center Canal (Oregon) Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction Subject Irrigation projects Remove constraint Subject: Irrigation projects

Search Results

  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4645
    P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 4647
    P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
    Citation
  • 4657
    P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; ...
    Citation
  • 4658
    P12-201-4576NA Klamath Project, OR-CA. Center Canal Flume Bridge. Setting of first section of bridge; April 21, 1978; USBR photo by D.J. Kline
    Citation
  • 4659
    P12-201-4577NA Klamath Project, OR-CA. Center Canal Flume Bridge. 3500 Manitowoc handled the 11-ton bridge deck load with no problems; April 21, 1978; USBR photo by D.J. Kline
    Citation
  • 4660
    P12-201-4578NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note hairline cracks in top surface of bridge. View is along west side of bridge; April 24, 1978; USBR photo by D.J. Kline
    Citation
  • 4661
    P12-201-4579NA Klamath Project, OR-CA. Center Canal Flume Bridge. All 4 beams in position prior to grouting. View looking north; April 24, 1978; USBR photo by D.J. Kline
    Citation
  • 4454
    P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
    Citation