Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Piling (Civil engineering) Remove constraint Subject: Piling (Civil engineering) Subject Pumping Plant EE (Oregon) Remove constraint Subject: Pumping Plant EE (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction

Search Results

  • 4398
    P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4401
    P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4402
    P12-201-4320 NA Klamath Project, OR-CA. Row 12, Line 1, piling split at a depth of approximately 47 feet, Plant EE; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4403
    P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
    Citation
  • 4410
    P12-201-4328 NA Klamath Project, OR-CA. View of pumping plant EE looking n. e. at piling with rows 6 thru 12 completed. Not shown are the 3 extra piling requred by the Regional office; February 17, ...
    Citation