Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Kline, D.J. Remove constraint Author: Kline, D.J. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Material Types Image Remove constraint Material Types: Image

Search Results

  • 4470
    P12-201-4388 NA Klamath Project, OR-CA. Inlet to Plant EE after nearly 2 inches of rain in a 5-hour period. Power to dewater pumps was lost due to lightning knocking out transformer. Power was out for ...
    Citation
  • 4476
    P12-201-4394 NA Klamath Project, OR-CA. Pumping Plant EE--View of inlet transition steel, showing finished product of original steel and added steel. Photo taken on east side of inlet just before tying ...
    Citation
  • 4477
    P12-201-4395 NA Klamath Project, OR-CA. Pumping Plant EE--Installation of 48" RCP outlet pipes. Checking placements prior to adding second section of pipe. Note cradle excavated for 48" RCP and extra ...
    Citation
  • 4478
    P12-201-4396 NA Klamath Project, OR-CA. Pumping Plant FF--View of inlet transition with cutoff wall formed and backfill completed just prior to installation of steel; July 18, 1977; USBR photo by D.J. ...
    Citation
  • 4479
    P12-201-4397 NA Klamath Project, OR-CA. Pumping Plant FF inlet transition resteel and forms for bottom slab placement; July 26, 1977; USBR photo by D.J. Kline
    Citation
  • 4480
    P12-201-4398 NA Klamath Project, OR-CA. Pumping Plant FF inlet transition floor placement. E-Con placer used to transfer concrete form transit mixer to pour site; July 28, 1977; USBR photo by D.J. Kli...
    Citation
  • 4481
    P12-201-4399 NA Klamath Project, OR-CA. Pumping Plant FF-Concrete placed in wall in 2 ft. lifts and vibrated by means of two small hand-held electric vibrators; August 5, 1977; USBR photo by D.J. Klin...
    Citation
  • 4486
    P12-201-4404 NA Klamath Project, OR-CA. Pumping Plant EE--Completed inlet transition on west side. Walls were form cured in 14 days; August 3, 1977; USBR photo by D.J. Kline
    Citation
  • 4487
    P12-201-4405 NA Klamath Project, OR-CA. Pumping Plant EE completed inlet transition on east side; August 3, 1977; USBR photo by D.J. Kline
    Citation
  • 4488
    P12-201-4406 NA Klamath Project, OR-CA. Pumping Plant EE--East side retaining wall with slab and footing ready for placement; July 27, 1977; USBR photo by D.J. Kline
    Citation