Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Material Types
Image
Remove constraint Material Types: Image
« Previous | 291 - 300 of 328 | Next »
Search Results
-
P12-201-4388 NA Klamath Project, OR-CA. Inlet to Plant EE after nearly 2 inches of rain in a 5-hour period. Power to dewater pumps was lost due to lightning knocking out transformer. Power was out for ...
Citation -
P12-201-4394 NA Klamath Project, OR-CA. Pumping Plant EE--View of inlet transition steel, showing finished product of original steel and added steel. Photo taken on east side of inlet just before tying ...
Citation -
P12-201-4395 NA Klamath Project, OR-CA. Pumping Plant EE--Installation of 48" RCP outlet pipes. Checking placements prior to adding second section of pipe. Note cradle excavated for 48" RCP and extra ...
Citation -
P12-201-4396 NA Klamath Project, OR-CA. Pumping Plant FF--View of inlet transition with cutoff wall formed and backfill completed just prior to installation of steel; July 18, 1977; USBR photo by D.J. ...
Citation -
P12-201-4397 NA Klamath Project, OR-CA. Pumping Plant FF inlet transition resteel and forms for bottom slab placement; July 26, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4398 NA Klamath Project, OR-CA. Pumping Plant FF inlet transition floor placement. E-Con placer used to transfer concrete form transit mixer to pour site; July 28, 1977; USBR photo by D.J. Kli...
Citation -
P12-201-4399 NA Klamath Project, OR-CA. Pumping Plant FF-Concrete placed in wall in 2 ft. lifts and vibrated by means of two small hand-held electric vibrators; August 5, 1977; USBR photo by D.J. Klin...
Citation -
P12-201-4404 NA Klamath Project, OR-CA. Pumping Plant EE--Completed inlet transition on west side. Walls were form cured in 14 days; August 3, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4405 NA Klamath Project, OR-CA. Pumping Plant EE completed inlet transition on east side; August 3, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4406 NA Klamath Project, OR-CA. Pumping Plant EE--East side retaining wall with slab and footing ready for placement; July 27, 1977; USBR photo by D.J. Kline
Citation