Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Pumping machinery
Remove constraint Subject: Pumping machinery
« Previous | 1 - 10 of 11 | Next »
Search Results
-
P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
Citation -
P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
Citation -
P12-201-4603NA Klamath Project, OR-CA. S-16 Drain -- Pump used for dewatering S-16 is a rental QP Model 401 4" pump. This was used for one week only; April 20, 1979; USBR photo by D.J. Kline
Citation -
P12-201-4604NA Klamath Project, OR-CA. S-16 Drain, existing outlet to KSD, Klamath Straits Unit West -- Volume of water being pumped by QP Model 401 pump is shown; April 20, 1979; USBR photo by D.J. ...
Citation -
P12-201-4523 NA Klamath Project, OR-CA. Plant FF No. 3 bay, between elev. A and B decks. Note effect of cleanup and also newly painted exterior surfaces of pump bowl and lower column; March 3, 1978; USBR ...
Citation -
P12-201-4524 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photo, except this view is of Plant FF, Bay # 2; March 3, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4525 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photos, except this view is of Plant FF, Bay # 1; March 3, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation -
P12-201-4607NA Klamath Project, OR-CA. Klamath Straits Unit East -- View of 6" master water pump set up on KSD. This pump will be used to fill water truck for dust abatement and treating fill material; ...
Citation -
P12-201-4337 NA Klamath Project, OR-CA. Pump used for water jetting piling on Plant EE. Suction line steel and outlet 2½" canvas; February 23, 1977; USBR photo by D. J. Kline
Citation