Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Kline, D.J. Remove constraint Author: Kline, D.J. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Pumping Plant E (Oregon) Remove constraint Subject: Pumping Plant E (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction Material Types Image Remove constraint Material Types: Image Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4654
    P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
    Citation
  • 4655
    P12-201-4573NA Klamath Project, OR-CA. Pumping Plant EE. View of combined inlet to Pumping Plants E and EE. More work remains to be done on rounded point between the two transitions; April 17, 1978; ...
    Citation
  • 4381
    P-12-201-4300 NA Klamath Project, OR-CA. Completed dike between P Plant EE excavation and Kl. Str. Drain. View, looking east. of existing Plant E and excavation for Pumping Plant EE; December 1976; ...
    Citation
  • 4554
    P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR ...
    Citation
  • 4555
    P12-201-4473 NA Klamath Project, OR-CA. Overall view of PP E and PP EE. Taken south of flume for center canal; November 23, 1977; USBR photo by D.J. Kline
    Citation
  • 4556
    P12-201-4474 NA Klamath Project, OR-CA. View of PP 'E' bridge looking from west to east. Piling far right driven to 40' depth. Remaining piling are in to a depth of 31'. Note: Center pile caught fire due ...
    Citation
  • 4557
    P12-201-4475 NA Klamath Project, OR-CA. Spoils removed from east side of PP 'E' outlet transition for PP 'E' bridge piling. Material was removed by backhoe due to rock; November 23, 1977; USBR photo by ...
    Citation
  • 4558
    P12-201-4476 NA Klamath Project, OR-CA. Case 580C Extend-a-Hoe excavating on east side of PP 'E' outlet transition for PP 'E' bridge piling. Note: Large rock in foreground removed from excavation; November ...
    Citation
  • 4626
    P12-201-4544NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows east side footing with 4 regular piles in front with 2 added piling in rear. One can just see the added pile behind ...
    Citation