Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 1 - 10 of 149 | Next »
Search Results
-
P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
Citation -
P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
Citation -
P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
Citation -
P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
Citation -
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
Citation -
P12-201-4481 NA Klamath Project, OR-CA. Picture shows area where PP 'E' bridge will be constructed over outlet transition. View taken from west side of KSD, looking east; November 15, 1977; USBR photo ...
Citation -
P12-201-4482 NA Klamath Project, OR-CA. View of inlet transition interior. Note: Walls were partially formed. Contractor covering up to prevent further amounts of snow from getting into formed walls; ...