Search Results
-
P12-201-4309 NA Klamath Project, OR-CA. Break in earth dike holding farm land flood water. Dike located on west side of KSD. Approx. 8 man hours and 2 hrs. of Case 580 time was used; January 17, 1977; ...
Citation -
P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4419 NA Klamath Project, OR-CA. Flooding of Horsley land northwest of Plants E and EE. Dike built by rancher west of Plant EE. High water due to rancher flooding his field for quackgrass control. ...
Citation -
P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
Citation -
P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
Citation -
P12-201-4603NA Klamath Project, OR-CA. S-16 Drain -- Pump used for dewatering S-16 is a rental QP Model 401 4" pump. This was used for one week only; April 20, 1979; USBR photo by D.J. Kline
Citation -
P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
Citation -
P12-201-4386 NA Klamath Project, OR-CA. Laborers working on compacted backfill on east side of Pumping Plant EE. Wackers were used on 6" lifts along sides close to structure. Five ton vibratory roller ...
Citation -
P12-201-4392 NA Klamath Project, OR-CA. Center Canal Flume--View of flume repairs. 24" CMP for supplying irrig. water to ranchers while allowing work inside flume. Nine 1-inch temporary flume tie rods ...
Citation -
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation