Search
You searched for:
Start Over
History
Remove constraint History
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
« Previous | 121 - 130 of 325 | Next »
Search Results
-
121. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4605NA Klamath Project, OR-CA. S-16 Drain, Klamath Straits Unit West -- Photo of S-16 looking west shows Gradall 600 shaping south 2:1 slope; April 23, 1979; USBR photo by D.J. KlineCitation -
122. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4606NA Klamath Project, OR-CA. S-16 Drain, Klamath Straits Unit West -- Photo of S-16 looking east with Cat 235 backhoe bulking out S-16 Drain. Gradall will finish sloping north 2:1 slope when ...Citation -
123. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4607NA Klamath Project, OR-CA. Klamath Straits Unit East -- View of 6" master water pump set up on KSD. This pump will be used to fill water truck for dust abatement and treating fill material; ...Citation -
124. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4608NA Klamath Project, OR-CA. S-15 area and North Road, Klamath Straits Unit East -- Photo shows road built by scraper from S-15 outlet into KSD to tie into North Road; April 30, 1979; USBR ...Citation -
125. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4609NA Klamath Project, OR-CA. 'A' Dike #12, Klamath Straits Unit East -- Test Excavation of north ditch Sta. 3+00 on 'A' dike #12 with 627 'B' scraper, scraper found surface even too wet, let ...Citation -
126. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4610NA Klamath Project, OR-CA. 'A' Dike #16, Klamath Straits Unit West -- Test excavation of 'A' Dike #10 with 627 B scrapers. With the sandy soil found here, the scrapers were able to excavate ...Citation -
127. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4611NA Klamath Project, OR-CA. Ray-Go 60 Ram compactor, Klamath Straits Drain -- Ray-Go has 9" deep foot penetration as shown; June 12, 1979; USBR photo by D.J. KlineCitation -
128. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4614NA Klamath Project, OR-CA. Ray-Go 60 Ram in action in C-1 lateral lining. Approx. Sta. 22+00; June 14, 1979; USBR photo by D.J. KlineCitation -
129. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4615NA Klamath Project, OR-CA. A-1-b Lateral, Klamath Straits Drain -- 40 cows belonging to Lou Hill escaped from fenced enclosure and did damage to survey staking on A-1-b Lateral; June 15, ...Citation -
130. [Image] Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor
P12-201-4619NA Klamath Project, OR-CA. C-1 Lateral, Klamath Straits Drain -- Photo shows C-1 liner from Sta. 26+00 looking east and west; June 19, 1979; USBR photo by D.J. KlineCitation