Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 14 | Next »
Search Results
-
P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
Citation -
P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
Citation -
P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. ...
Citation -
P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
Citation -
P12-201-4422 NA Klamath Project, OR-CA. Ady Canal--1'x1' steel H beam was used between kickers and tunnel cribbing; August 25, 1977; USBR photo by D.J. Kline