You searched for: Start Over Irrigation Remove constraint Irrigation Author Kline, D.J. Remove constraint Author: Kline, D.J. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Concrete slabs Remove constraint Subject: Concrete slabs Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Pumping Plant FF (Oregon) Remove constraint Subject: Pumping Plant FF (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction Material Types Image Remove constraint Material Types: Image

Search Results

  • 4441
    P12-201-4359 NA Klamath Project, OR-CA. Applying final concrete lift on this section (SW corner) of Plant FF bottom slab; May 5, 1977; USBR photo by D. J. Kline
    Citation
  • 4442
    P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
    Citation
  • 4443
    P12-201-4361 NA Klamath Project, OR-CA. Pumping Plant FF slab concrete placement. View shows placing concrete for first lift. (Slab was placed in two lifts). Vibration was by means of two air-powered vibrators ...
    Citation
  • 4459
    P12-201-4377 NA Klamath Project, OR-CA. Pumping Plant FF--View looking south of concrete placement for walls up to base of Elev. B slab; May 31, 1977; USBR photo by D. J. Kline
    Citation
  • 4460
    P12-201-4378 NA Klamath Project, OR-CA. Pumping Plant FF--View looking west at placement for slab foundation. E-Con placer setting up to unload mixer truck; May 1977; USBR photo by D. J. Kline
    Citation
  • 4461
    P12-201-4379 NA Klamath Project, OR-CA. Pumping Plant FF--Placement for foundation slab; two bays completed and preparing to start on third and last bay. View looking sw. Workers at inlet side of slab; ...
    Citation
  • 4462
    P12-201-4380 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast: slab completed. Burke-White pigmented curing compound has been applied by spray. Three smudge pot heaters placed in ...
    Citation
  • 4541
    P12-201-4549 NA Klamath Project, OR-CA. View looking east. Pumping Plant FF--north retaining wall. Section "A" placed previously. Section "B" where laborers working and Section "C" freshly placed concrete ...
    Citation